Patrick Mukonki May
 
|
Twitter
|
Facebook
|
Google+
|
VKontakte
|
LinkedIn
|
 
 
International Journal of Innovation and Scientific Research
ISSN: 2351-8014
 
 
Friday 30 July 2021

About IJISR

News

Submission

Downloads

Archives

Custom Search

Contact

Connect with IJISR

   
 
 
 

Patrick Mukonki May


Personal

Name Patrick Mukonki May
Affiliation Mining Engineering Department, University of Lubumbashi, Faculty of Engineering, University of Lubumbashi, Lubumbashi, Haut-Katanga province, RD Congo

Documents: 2

Document title Date Issue
Establishment of a mathematical relationship to correlate fleet size with equipment availability in open pit mine, using curve-fitting techniques: A case study of Mashamba copper deposit in the Democratic Republic of Congo)
Author(s): Patrick Mukonki May and Augustin Muhota Kawinda
Show abstract   Full Text
2017 30 (2) , pp. 234-241
Strategic mine planning approach for determination of operational pushbacks using Datamine NPV Scheduler: case study of the Mashamba East open pit mine, Democratic Republic of Congo
Author(s): Patrick Mukonki May and Augustin Muhota Kawinda
Show abstract   Full Text
2017 30 (2) , pp. 269-279